Under constructionRheinland-Pfalz
Siesbach Süd wind farm
Three Enercon E-138 turbines south of Siesbach. The infrastructure is in place, and the foundations are now being built. Commissioning planned for 2027.
Projects
What we are planning and building right now. The project pages show how far each one has come and what the region gains from it.

Under constructionRheinland-Pfalz
Three Enercon E-138 turbines south of Siesbach. The infrastructure is in place, and the foundations are now being built. Commissioning planned for 2027.

PermittedThüringen
Six modern turbines will replace seven first-generation ones. Permitted in March 2026, with construction planned to start in the fourth quarter of 2027.
VisualisationUnder constructionThüringen
A storage system with 18 MW and 40 MWh right next to our substation. Construction is under way.
What a wind farm brings to a municipality and which rules apply in our federal states: Together with the community